News
The 19.15 km line will enhance connectivity, passing key points. Currently, three trains will operate at 25-minute intervals, pending safety inspections.
Bangalore MP Tejasvi Surya asks people to join a protest on July 5 to demand the delayed Yellow Line metro opens soon.
The much-awaited Yellow Line of Bengaluru’s Namma Metro, stretching 19.15 km from RV Road to Bommasandra, has faced repeated ...
10h
India Today on MSNTejasvi Surya demands Bengaluru Metro's delayed route, calls for public protestBangalore South MP Tejasvi Surya has called out BMRCL over the prolonged delay in launching the Yellow Line metro. He urged ...
TRSL to deliver India-made trains for Bengaluru's Yellow Line from August; two trains per month starting September.
Public outcry grows as Namma Metro's Yellow Line faces yet another delay, sparking criticism and protest over constant ...
Yellow Line to open in August post safety inspection; BMRCL prepares for launch with limited trains and driverless tech.
1don MSN
Bengaluru's Namma Metro Yellow Line, an 18.8 km elevated stretch connecting RV Road to Bommasandra, is nearing completion ...
The 19.15-kilometre-long Yellow Line will connect RV Road with Bommasandra and will traverse several major parts of the city, ...
4hon MSN
The Bengaluru Metro Rail Corporation Limited (BMRCL) has announced a brief suspension of services on a section of the Purple ...
Bengaluru’s Namma Metro Yellow Line is set to open in early August with limited trains, pending safety approvals, covering 16 ...
BMRCL plans to open the 19.15-km Yellow Line by August, aiming to boost daily metro ridership from 8.5 lakh to 14 lakh. BCIC ...
Results that may be inaccessible to you are currently showing.
Hide inaccessible results