In its simplest (and perhaps least effective) form, lockout/tagout (LOTO) consists of three steps: Identify the breaker (or fuse) that supplies power to your equipment. Open the breaker. Hang your ...
Lockout/tagout was one of the first requirements OSHA mandated, starting in 1990. The electrical lockout/tagout regulation became effective in 1990, as well as part of Subpart S. Lockout/tagout ...
Beyond the Products: 5-Steps to a Best Practice Lockout Program You have safety padlocks, lockout tags, and circuit breaker, electrical and valve lockout devices.
Industry trade groups have weighed in — both pro and con — on whether the Occupational Safety and Health Administration should update its 30-year-old lockout/tag-out rules. The proposed change ...
Dear James: There were two electrical house fires in my neighborhood this year, and both houses had circuit breakers. Please explain the differences between fuses, breakers, ground fault and arc fault ...
The answer is actually quite simple, but let me first explain why that locking device is there. Section 422.30 of the National Electric Code (NEC) requires a disconnecting means for all appliances.
It is a common practice to lockout and/or tagout control devices. In a nuclear power plant’s control room with its many analog controls, you might (for example) see red covers over specific switches.